Info

PACKAGING

We have regular management of material-handling, packaging, transportation, warehousing and security to meet the requirements of consumers frequently.

Standard packing:
  • 25kg Kraft paper bag (with/without inner plastic).
  • 25kg low melting PE bag.
  • Export Item: EXWORKS, FOB, CIF, CFR… as requirements.
After Packaging:
  • The products are also re-checked and evaluated of 10%- 15% of weight size before dispatching
Storage:
  • Store in a dry place and avoid extreme fluctuations in temperature..
  • Special conditions for opened packaging: Close bags after use to prevent the absorption of moisture and contamination.

DELIVERY

  • Accepted Export terms: EXWORKS, FOB, CIF, CFR….upon requirements.
  • Accepted Payment Currency: USD
  • Accepted Payment Type: L/C, T/T
  • Delivery Time: within 20 working days since contract date
  • Average Lead Time: 07 working days